top of page
Writer's pictureStephen Strum

Operating Session on the 2’x4’ N Scale Layout

Updated: Jul 29


A look at an operating session with a switch list on the 2’x4’ N Scale project layout. This was a simple operating session that only took about 10 minutes, although it would have taken longer if I was able to control the locomotive at a slower speed better. I’ll be converting the Atlas GP15 to DCC in another video, which will allow me much better control of the locomotive at slow speeds, at least on this particular layout with the controls that I have on it. This is a fun layout to operate, especially since you can run other trains while doing the operating session.


Join this channel to get access to perks: https://www.youtube.com/channel/UC6aZTKFo_730teGKjWnwYmg/join


Want to support with a one time donation? Buy me a cup of coffee! https://www.buymeacoffee.com/stephenstrum


You can watch the full video of the operating session below.



271 views0 comments

Коментарі


bottom of page