top of page
Writer's pictureStephen Strum

First Two Structures Installed on the 2’x4’ Layout!


Progress is speeding up on the 2'x4' model railroad project. I have all the roads and structure bases done, and I now have the first two structures permanently installed on the layout, along with the surrounding scenery.


Watch the video below to see the latest progress and to watch some trains run by the latest structure and scenery additions.



127 views0 comments

Recent Posts

See All

Commenti


bottom of page